So I’m in the final stretches of the office build. I’ve started building the or rather constructing the spray booth, here are some images of where I got up to since my previous update.

I’m currently at the stage of constructing the fan base and the exhaust system from the rear end of the booth. I have a few more ideas for this including a slide in filter system which can be removed at any stage to replace the filter sheets. It’s taking a bit of time but should be completed this week. There is so much left to do including all the electrics. The spray booth daylight strip is in place and ready for power. I will update again over the weekend and there should be more to see. Once this is done I have a 20” monitor to be added above or to the right of the booth. Then it’s time to sand down and fill in. Once this is completed it’s time for paint then the carpet fitters are in to complete the interior. Can’t wait. It’s been a long hard trek but the end is near and I can get back to my builds.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s